Our projects


Industrial Steve Londre Industrial Steve Londre

Specialty Foods Distribution

This 130,000 square foot pre-engineered metal building houses all types of dry grocery goods for distribution throughout a three state area. It includes a 10,000 square foot retail store with 5,000 square feet of office space. The office area is constructed out of insulated precast wall panels.

Read More
Industrial Steve Londre Industrial Steve Londre

Gundersen Logistics Facility

The Gundersen Logistics Facility job was a phased remodel project that consisted of renovations to an existing two story office space, façade improvements, loading dock addition, warehouse improvements, carport addition, interior addition of 2nd floor mezzanine and 1st floor pharmacy interior build out, and site work.

Read More
Industrial Steve Londre Industrial Steve Londre

Pepsi Cola

When a tornado swept through the La Crosse area, Pepsi-Cola of La Crosse suffered extensive damage to their facility. Wieser Brothers was able to complete the demolition and rebuilding of the 45,000 square foot new construction (19,500 S.F. warehouse rebuild and 25,500 S.F. office rebuild) while Pepsi continued their day-to-day operations inside.

Read More
Industrial Steve Londre Industrial Steve Londre

Ashley Furniture Distribution Center

The Ashley Furniture e-commerce Distribution Center has a building footprint of 430,120 square feet, 4,875 square foot 2nd floor office space, and a 70,425 square foot storage mezzanine for a building total of 500,279 square feet (9.87 acres).

Read More
Industrial Steve Londre Industrial Steve Londre

Vernon Electric Cooperative

This newly constructed facility in Westby, WI has 15,000 square feet of office space, 15,000 square feet of warehouse, and 20,000 square feet of vehicle storage for a total of 50,000 square feet.

Read More
Industrial Steve Londre Industrial Steve Londre

Westby Creamery Distribution Center

This project was a new building consisting of refrigerated storage and office space. The warehouse was constructed of structural steel framing and insulated metal wall panels. The office was constructed using pre-engineered steel. The site layout and building was designed to accommodate a future 50,000 square foot production facility.

Read More
Industrial Steve Londre Industrial Steve Londre

Unimin Corporation Frac Sand Mine

The Unimin Tunnel City Concrete Foundation project consists of a 101,400 square foot process facility which includes two (2) sloped drain slabs, a wet process area, a drying area, a screening area, and a rail load out facility. Over 13,000 cubic yards of concrete, 1,057 tons of reinforcing steel, and 2,400 lineal feet of trench drains were used to construct the cast-in-place structural concrete foundations. Wieser Brothers completed the project in the projected 6 month time frame.

Read More
Industrial Steve Londre Industrial Steve Londre

Hawkeye Electric Cooperative

This project was a 53,723 square foot facility attached to an existing pole shed. The garage, shop, and maintenance portion of the building is 39,168 square feet and is made of precast walls. The office portion is 14,555 square feet and is constructed out of masonry.

Read More