Crucifixion School

La Crescent, MN

This project consisted of a three-story addition onto an existing school. </p>

The school was built out of structural steel and metal studs.

The new three-story addition included three (3) classrooms, one (1) large conference room, three (3) offices for facility members, and an elevator.

Their goal was to keep the school open during the construction process and bring the existing building up to ADA code.

Back to projects
alt
alt
alt
alt