St. Martin's Lutheran School

Winona, MN

The 33,100 SF two story early childhood – 12th grade school is constructed of a structural steel and light gauge steel skeleton, steel and concrete second floor with an elevator for easy access.

The project consisted of a playground for the younger children, classrooms equipped with the latest technology for grades kindergarten through twelve including a media room, art room and music room. The faculty area includes, spacious lobby area, two Principal’s offices, Early Childhood Directors office, conference room, sick room, and a teacher’s workroom.

 

Back to Projects
https://images.prismic.io/wb2020/6b692a5b-471e-4f8b-97d2-25b3568b25aa_Picture1.png?auto=compress,format
https://images.prismic.io/wb2020/19046d14-7b99-468b-9d41-acdd1dd07e3b_Picture3.png?auto=compress,format
https://images.prismic.io/wb2020/cbe03bf4-7da1-44b7-b029-716cf68fddb3_Picture2.png?auto=compress,format